BEE PRECISION 600

BEE Precision 600
Package
- 150 micron pre filter
- Liquid or solid
catalyst can be used
- Sodium/Potassium
Methylate air diaphragm pump
- Methanol
feed/circulation air diaphragm pump
- Stainless steel 285 Litres sodium Methylate/methanol mix tank on load cells
- Feedstock
feed/circulation centrifugal pump with ATEX motor – 150 LPM
- 24 kW feedstock
electric heater on reactor
- Two (2) Stainless
Steel Reactor Vessel – 1,515 Litres
- Ion Tower feed/transfer pump – 22 LPM
- Two (2) Stainless Steel Ion Exchange Resin Tower
- Each tower holds 6ft3
of resin (Resin Not Included)
- Stainless Steel
Methanol Recovery Batch Flash Evaporator – 1,815 Litres
- 36 kW Electric Heater
- Centrifugal
circulation/transfer pump with ATEX motor – 150 LPM
- Air Fin Condenser with
Fan
- Vacuum Pump to pull
methanol vapors
- Stainless Steel
Methanol Recovery Tank – 150 Litres
- Stainless Steel
Plumbing
- Stainless Steel valves
and fittings
- All piping is welded
and flanged
- Skid mounted
- Visual Indication
gages
- Control panel with
Color Touch Screen
- Completely wired,
piped, and tested
- A full automation package is available for this unit.
- A centrifuge can be added to this unit.
- Pretreatment equipment can be added to this unit.
QUESTIONS? - CONTACT US
Dimensions: | 8’ W X 20’ L X 10’ H |
Weight: | Approximately 2000 Lbs. (empty). |
Capacity: | 2,270 Litres of Oil
|
Construction: | All materials used in the construction
of this system will be 304 Stainless Steel. |
Piping: | Stainless Steel |
Electrical: | 480V/3PH/50Hz – ATEX |
Controls: | Automatic mode controlled by PLC and color touch screen; Start
button initiates semi-automated process; Manual glycerin and fuel transfer
modes require Human action. |
Reaction Method: | Base Transesterification |
Wash Method: | Dry Wash using Purolite PD206.
No Water used! |
Batch Time: | Heating of material and Methoxide mixing 1 hr Reaction Time - 1 hrs Settling Time - 4 hrs (2hrs for each vessel) Dry Wash- 1 hr Methanol Recovery 1hr |
Total Process Time: | Approx. 8 hours start to finish. (Time Varies depending upon
process, see time frames below) |





CONTACT US